Lead Free Products

Model: Q219LF

Leadfree Brass Ball Valve, Pex-A connection

Product Description

  • Leadfree Brass material;
  • Double O-ring Stem seal;
  • Max Operating Pressure Rating: 400PSI CWP
  • Max Temperature : 200°F (93°C) max
  • Certificate Pending: cUPC, NSF/ANSI 61 & NSF/ANSI 372
  • Connection: PEX-A, per ASTM F1960
  • Size: 1/2"- 2-1/2"

Related Products

  • Model: Q2881LF

    Tankless Water Heaters Isolation Valve Kits

    Ultra compact body design; Hot water & cold water; Leadfree brass material; Integral hose drain valve; Double o-ring stem seal; Max Operating Pressure Rating: 200PSI CWP Max Max Temperature: 200°F (93°C) max Certificate Pending: cUPC, NSF/ANSI 61 & NSF/ANSI 372 Connection: PEX-A, per ASTM F1960 Size: 3/4"
    More Details
  • Model: A21LF

    Pressure Relief Valve

    Leadfree Brass Material Compact body design Max Operating Pressure Rating: 150 PSI – 200,000 btu/hr Max Temperature: 210°F (99°C) Certificate Pending: CSA ANSI Z21.22 CSA 4.4 Size: 3/4″ NPT Male x Female
    More Details
  • Model: Q621LF

    Lead Free Brass Ball Valve, Push Fit connection

    Leadfree brass material Push Fit connection Double o-ring stem seal Full port Max Operating Pressure Rating: 200PSI CWP Max Temperature: 200°F (93°C) max IAPMO Listed for cUPC, NSF/ANSI 61 & NSF/ANSI 372; Size: 1/2", 3/4", 1"
    More Details

Packaging & Shipping

  • Standard packaging: inner box, master carton and plywood pallets.
  • Personal packaging acceptable per customer instruction, retail packaging or bulk packaging, label, hang tag, etc.
  • Shipping lead time 45days in average worldwide ocean delivery, Incoterms FOB, CIF, EXW, etc.

Request A Quote

Contact us for more information on Application Consultation, Sample Support, FOB Pricing etc.
You will be replied within 8 hours.

Frequently Asked Questions

  • Who should I contact if I have question?

    Email to:

    [email protected] contact person March Hu
    [email protected] contact person Daisy Kan

  • What is your sample lead time ?

    In average 45-60 days.

  • What shall I submit for OEM production enquiry?

    Prefer to both drawings and samples, otherwise either drawings or samples

  • What is your mass production lead time?

    Depending on purchase order quantity, in average 45-60 days.

  • What is payment term required?

    Based on customer credit:

    • T/T 30% down payment, 70% balance against BL document,
    • T/T payment 30-90 days for long term big brands
  • Do you provide any warranty?

    It depends, normally 3 years.